Case Details
XX Information Technology is the first professional provider in China offering integrated (IT) management solutions for the machinery equipment and manufacturing industries. It operates its own large-scale data centers, uses SAP-ERP as its core application, and deeply integrates OA and MES systems. From enterprise management informatization planning to industry-specific integrated solutions, from customized system implementation and operation maintenance to data center network hardware services, the company provides clients with "one-stop" highly integrated IT construction services.
Leveraging over a decade of experience in information management for the machinery equipment industry, XX Information Technology designs highly customized IT management solutions and application platforms tailored to clients’ industry characteristics, development stages, and organizational structures. Specifically for order-based production, single-piece/small-batch production, and turnkey equipment manufacturing enterprises, it introduces advanced end-to-end management technologies and highly integrated software to eliminate information silos and management gaps, delivering world-class management processes and software that significantly enhance clients’ operational efficiency and market competitiveness.
The company has invested in building the largest and most advanced industrial enterprise-level data center in South China. Equipped with state-of-the-art network server hardware, it provides enterprises with remote IT application hardware platform support, data exchange and storage, disaster recovery and backup, and various remote application services. Anchored by its data centers, it offers IT management outsourcing services—including system implementation, daily operation maintenance, and secondary development—by integrating software with services, software with manufacturing, and technical expertise with industry management capabilities.
XX Information Technology, based on its deep understanding of machinery equipment clients’ applications and services, develops customized software for equipment turnkey production management, equipment lifecycle management, smart manufacturing, and remote data management for industry enterprises. It helps clients achieve product-service integration to meet their end-to-end IT management needs from product development to after-sales services.
XX Information Technology’s advanced data center, constructed by our company, focuses on building the core data center for its SAP service platform:
-
The total construction area of the machine room is approximately 84 square meters, with a ceiling height of 3.8 meters and a designed net height of 3 meters. It is functionally divided into a working area (60㎡) and an auxiliary area (20㎡).
-
In line with the usage, management requirements, importance, and initial cost considerations of the core platform, it is built to Class C data center standards as specified in national design codes (GB 50174).
Construction Scope
✓ Data Center Decoration System: Includes ceiling, flooring, wall panels, partitions, doors, and windows.
✓ Electrical System: Covers power supply, UPS power distribution, lighting power distribution, lightning protection & grounding, and anti-static systems.
✓ Precision Air Conditioning System.
✓ Gas Fire Protection System.
✓ Environmental Monitoring System: Monitors power distribution, UPS, precision air conditioning, fire protection, water leakage, access control, and surveillance.
✓ Structured Cabling System and Security System: Includes closed-circuit TV (CCTV) surveillance, burglar alarm, and access control systems.
Renderings

Computer Room Photo
